Thurman Arroyos I and II (№9983457)

15 sep

Number: 9983457

Country: United States

Source: Federal Business Opportunities


Link to original

To view links to the source need to register

Publication date


15-09-2018

Description


Thurman Arroyos I and II Solicitation Number: 191BWC18B0004
Agency: International Boundary and Water Commission
Office: Acquisition Division
Location: Acquisition Division

Solicitation Number: 191BWC18B0004

Notice Type: Award

Contract Award Date: September 14, 2018

Contract Award Number: 191BWC18C0006

Contract Award Dollar Amount: 4843651.00

Contractor Awarded Name: Kirkland Construction

Contractor Awarded DUNS: 048124598

Contractor Awarded Address: 2101 Main St
Rye, Colorado 81069
United States

Synopsis: Added: Jun 13, 2018 5:12 pm

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (sealed bid) for the purpose of removing sediment in Thurman I Arroyo, Thurman II Arroyo, and a 9500-linear foot section of the Rio Grande, and to construct sediment basins with erosion protection, concrete end walls, and drilled piers.


The Work for this project generally consists of removal of existing rocks and sediment in Thurman Arroyos I and II within the limits of USIBWC"s right of way and construction of dewatering, sedimentation basins, concrete end walls, drilled piers, erosion protection, flex base maintenance road, site grading, and associated drainage improvements. Major tasks include: removal of rocks and sediment from arroyos, installation of sedimentation basins & concrete end walls, drilled piers, and removal of sediment along a 9500-linear foot stretch from the Rio Grande.


Work within the Rio Grande will have to be done during the non-irrigation season, which typically runs from mid-October to the beginning of February. Coordination will have to be made with the USIBWC and Elephant Butte Irrigation District for irrigation season dates. Work within the arroyos can be done during irrigation and non-irrigation season. Construction cannot start until the required submittals have been determined satisfactory for beginning construction.


The magnitude of the project is estimated between $1000000 and $5000000.


A site visit date will be listed in the solicitation.


The contract will be a firm fixed price.


All work shall be completed within two hundred forty (240) calendar days after the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.


The solicitation, plans, and specifications are expected to be posted on or about July 2, 2018 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by July 2, 2018 that is because the solicitation is not available for posting). The solicitation will be available for a minimum of thirty (30) calendar days.


This is a Pre-solicitation Notice. The Solicitation will include information on how to obtain the plans and specifications. All responsible sources may submit a bid to be considered by the Agency.


Added: Jul 06, 2018 4:25 pm THIS IS THE SOLICITATION NOTICE.  THE USIBWC IS REQUESTING BIDS AT THIS TIME.  Please refer to the solicitation package. Added: Aug 09, 2018 5:53 pm Amendment to add changes to the drawings and extend bid closing date. 

Please consult the list of

document viewers if you cannot open a file. Solicitation 1 Type: Solicitation

Posted Date: July 6, 2018



191BWC18B0004.pdf (124.17 Kb) Description: Solicitation 191BWC18B0004

J.01_Thurman_Specs_20180705.pdf (3325.39 Kb) Description: Thurman Specs 20180705

J.02_191BWC18B0004_Drawings_20180626_11x17.pdf (9420.83 Kb) Description: 191BWC18B0004 Drawings 20180626 11x17

J.03_191BWC18B0004_Drawings_20180626_22x34.pdf (1543.00 Kb) Description: 191BWC18B0004 Drawings 20180626 22x34

J.04_2009_06_04_ROD_for_RGCP.pdf (221.68 Kb) Description: 2009 06 04 ROD for RGCP

J.05_2011_10_BA_for_RGCP.pdf (3243.62 Kb) Description: 2011 10 BA for RGCP

J.06_2015_10_20_Channel_Maint_Alternatives.pdf (2671.25 Kb) Description: 2015 10 20 Channel Maint Alternatives

J.07_2017_03_01_NWP_NMED_cert.pdf (659.48 Kb) Description: 2017 03 01 NWP NMED cert

J.08_2017_08_16_BO_for_RGCP.pdf (729.76 Kb) Description: 2017 08 16 BO for RGCP

J.09_2017_12_06_EA_Thurman_I_and_II.pdf (4494.54 Kb) Description: 2017 12 06 EA Thurman I and II

J.10_2018_05_02_Mitigation_Plan_Thurman_I_and_II.pdf (3241.89 Kb) Description: 2018 05 02 Mitigation Plan Thurman I and II

J.11_2018_06_14_Thurman_Arroyos_Design_Report.pdf (4194.40 Kb) Description: 2018 06 14 Thurman Arroyos Design Report

J.12_Geotech_Hatch_Final_VI_S&B_8-4-2008.pdf (5057.70 Kb) Description: Geotech Hatch Final VI S&B 8-4-2008

J.13_Geotech_Hatch_Final_VII_S&B_8-4-2008.pdf (1611.06 Kb) Description: Geotech Hatch Final VII S&B 8-4-2008

J.14_IBWC_Form_110.pdf (217.09 Kb) Description: IBWC Form 110

J.15_IBWC_Form_116.pdf (18.84 Kb) Description: IBWC Form 116

J.16_IBWC_Form_117.pdf (202.17 Kb) Description: IBWC Form 117

J.17_IBWC_Form_245_Minimum_Quals_for_Award.pdf (111.86 Kb) Description: IBWC Form 245 Minimum Quals for Award

J.18_IBWC_Form_245B_Backup_Information.pdf (192.65 Kb) Description: IBWC Form 245B Backup Information

J.19_NM180014_01052018_NM14.pdf (63.58 Kb) Description: NM180014 01052018 NM14

Amendment 1 Type: Mod/Amendment

Posted Date: July 26, 2018



191BWC18B0004_0001.pdf (408.28 Kb) Description: Amendment 001 Q&A, Site visit sign-in sheet, CLIN 011 added.

Amendment 2 Type: Mod/Amendment

Posted Date: August 1, 2018



191BWC18B0004_0002.pdf (93.61 Kb) Description: 191BWC18B0004 0002

J.21 22x34 Final Drawings USIBWC Sediment Basins 2018-06-14(d).pdf (41681.81 Kb) Description: J.21 22x34 Final Drawings USIBWC Sediment Basins 2018-06-14(d)

J.22 191BWC18B0004 Thurman Specs 20180731.pdf (3170.09 Kb) Description: J.22 191BWC18B0004 Thurman Specs 20180731

J.23 Thurman Add to Specs Mitigation Figures.pdf (2344.24 Kb) Description: J.23 Thurman Add to Specs Mitigation Figures

J.24 Thurman Amendment for changes to specifications and drawings 20180731.pdf (71.46 Kb)

J.20_11x17_Final_Drawings_USIBWC_Sediment_Basins_2018-06-14(d).pdf (3148.19 Kb) Description: J.20 11x17 Final Drawings USIBWC Sediment Basins 2018-06-14(d)

J.21_22x34_Final_Drawings_USIBWC_Sediment_Basins_2018-06-14(d).zip (7249.80 Kb) Description: J.21 22x34 Final Drawings USIBWC Sediment Basins 2018-06-14(d)

J.22_191BWC18B0004_Thurman_Specs_20180731.zip (3057.05 Kb) Description: J.22 191BWC18B0004 Thurman Specs 20180731

J.23_Thurman_Add_to_Specs_Mitigation_Figures.zip (2340.42 Kb) Description: J.23 Thurman Add to Specs Mitigation Figures

Amendment 3 Type: Mod/Amendment

Posted Date: August 4, 2018



191BWC18B0004_0003.pdf (58.94 Kb) Description: Amendment 003 to extend the bid closing date.

Package #5 Posted Date: August 8, 2018



191BWC18B0004_0004.pdf (121.24 Kb) Description: 191BWC18B0004 0004

J.25 11x17 Final Drawings USIBWC Sediment Basins 20180807.pdf (12938.42 Kb) Description: J.25

J.26 22x34 Final Drawings USIBWC Sediment Basins 20180807.pdf (14627.62 Kb) Description: J.26

J.27 Thurman Amendment Revised Drawings 20180807.pdf (230.07 Kb) Description: J.27

J.25_11x17_Final_Drawings_USIBWC_Sediment_Basins_20180807.zip (2027.77 Kb) Description: J.25

J.26_22x34_Final_Drawings_USIBWC_Sediment_Basins_20180807.zip (3700.27 Kb) Description: J.26

Package #6 Posted Date: August 9, 2018



191BWC18B0004_0005.pdf (135.46 Kb) Description: 191BWC18B0004 0005

J.28 11x17 Final Drawings USIBWC Sediment Basins 20180808.pdf (13004.15 Kb) Description: J.28

J.29 22x34 Final Drawings USIBWC Sediment Basins 20180808.pdf (14709.88 Kb) Description: J.29

J.28_11x17_Final_Drawings_USIBWC_Sediment_Basins_20180808.zip (2085.42 Kb) Description: J.28

J.29_22x34_Final_Drawings_USIBWC_Sediment_Basins_20180808.zip (3773.69 Kb) Description: J.29

J.30_Thurman_Amendment__Revised_Drawings_20180808.zip (224.18 Kb) Description: J.30



Contracting Office Address: 4171 North Mesa, Suite C-100
El Paso, Texas 79902
United States


Place of Performance: The work is located in Dona Ana County, New Mexico.

United States


Primary Point of Contact.: Philip K. Johnson, Contracting Officer

[email protected] Phone: 9158324714