Clean and Resurface Inside of 10 EA Water Tanks, Osan AB (MATOC ONLY) (№10032504)

19 sep

Number: 10032504

Country: United States

Source: Federal Business Opportunities


Link to original

To view links to the source need to register

Publication date


19-09-2018

Description


Clean and Resurface Inside of 10 EA Water Tanks, Osan AB (MATOC ONLY)Solicitation Number: W90VN618R0034
Agency: Department of the Army
Office: Army Contracting Command, CSBs
Location: 411TH CSB (W90VN6) RCO OSAN

Solicitation Number: W90VN618R0034

Notice Type: Award

Contract Award Date: September 17, 2018

Contract Award Number: W91QVN-18-D-0057-W90VN618F0121

Contract Award Dollar Amount: 72145.41

Contractor Awarded Name: Yibon Construction Co.

Synopsis: Added: Jul 31, 2018 12:23 am 2. PRINCIPLE WORK FEATURES (REMOVAL): This project includes, but is not limited to, the following principle removal features.

(a) Remove existing paint and clean at interior surface of water tanks with sand blasting or water jet.

3. PRINCIPLE WORK FEATURES (INSTALLATION): This project includes, but is not limited to, the
Following principles features of installation. (See attached list of tank)


(a) Surface preparation and cleaning of steel and other hard materials by brush and high pressure water jetting prior to recoating for the interior water tanks and water poof by epoxy coating. (Tank 10ea) Reference O&MA spec 09 90 00.
(b) Apply coatings that conform to the respective specifications listed in the following Interior Concrete Paint Table and Interior Metal, Ferrous and Non-Ferrous Paint Table.


(c) After Contract award, Shop drawing shall be show scaffolding and safety plan for the type of material and fabrication details and installation procedures.


(d) ©All cleaning and paint work will meet current National Environment Regulations.


Paint of water tank Base wide

Working Replace Remarks
1 Bldg 354, 361(2ea) Direct water line
2 Bldg 462 (#1) Bldg 463(#2)464(#3)
Bldg 463 (#2) Bldg 461(#1), 464(#3)
Bldg 464 (#3) Bldg 461(#1), 463(#2)
3 Bldg 991 (#5) Bldg 992 (#7)
Bldg 992 (#7) Bldg 991 (#5)
4 Bldg 1038(#6) Bldg 1035 (#8)
Bldg 1035 (#8) Bldg 1038(#6)



4. Damage: Any damage created as a result of the contractor"s actions shall be repaired by him at no cost to the Government.


5. Contractor"s responsibilities: It is the contractor"s responsibility to verify the measurements provided in these documents and comply with items stated as any local regulations concerning this type of work.

(a) Contractor shall be responsible for cleanup and disposal of all work related debris.
(b) Government have responsible for vacate and refill of the water tanks.


6. Warranty: All Material and workmanship will be warranted against defects for a period of 1 year.


7. Work period: The contractor will have 180 days, received N.T.P from K.O of this contract, to complete all work in its entirety.



Please consult the list of

document viewers if you cannot open a file. Solicitation Type: Other (Draft RFPs/RFIs, Responses to Questions, etc..)

Label: Solicitation

Posted Date: July 31, 2018



SF1442.pdf (343.93 Kb) Description: SF1442

Drawings.pdf (4505.13 Kb) Description: Drawings



Contracting Office Address: Unit #15289
APO, Non-U.S. 96205-5289
Korea, South


Primary Point of Contact.: Chaeyong Yi, Contract Specialist

[email protected] Phone: 3157848977