CA ERFO DEVA 11(1), Bonnie Clare Road (№10028791)

18 sep

Number: 10028791

Country: United States

Source: Federal Business Opportunities


Link to original

To view links to the source need to register

Publication date


18-09-2018

Description


CA ERFO DEVA 11(1), Bonnie Clare RoadSolicitation Number: 6982AF18B000021
Agency: Department of Transportation
Office: Federal Highway Administration (FHWA)
Location: Central Federal Lands Highway Division

Solicitation Number: 6982AF18B000021

Notice Type: Award

Contract Award Date: September 13, 2018

Contract Award Number: 6982AF18C000039

Contract Award Dollar Amount: $12758878.00

Contract Line Item Number: Schedule A, Option Y

Contractor Awarded Name: Road and Highway Builders, LLC.

Synopsis: Added: Jun 19, 2018 4:14 pm Modified: Aug 01, 2018 8:30 am

Track Changes PROJECT NUMBER: CA ERFO DEVA 11(1)

PROJECT NAME: Bonnie Clare Road


PROJECT DESCRIPTION: This project is located near the northeast border of Death Valley National Park beginning at the Nevada state line on Nevada State Route 267 and California state line and ending at the intersection of Ubehebe Crater Rd and Scotty"s Castle Road 0.2 miles north of the Grapevine Ranger Station in Death Valley National Park. The project is funded with Emergency Relief for Federally Owned Roads (ERFO) to reconstruct the road damaged from a natural disaster.


Schedule A Bonnie Clare Road - The intent of this project is to reconstruct Bonnie Clare Road after it was destroyed by flooding in October 2015. The roadway was destroyed and significant areas have been eroded away. The project is 7.52 miles long and will include significant earthwork, embankment protection measures, roadway obliteration, removal of damaged roadway and flood debris, aggregate base installation, and asphalt paving. Concrete barrier and revet mattress will be constructed/installed along the roadway in areas subject to flooding.


Option X Waterline Relocation - Install 12" HDPE 4710 DR9 IPS waterline under the roadway. The waterline is part of a larger system being installed by NPS contractors from the Scotty"s Castle pump house to an intake near Scotty"s Castle.


Option Y Historic Fence Repair - Replace and repair historic fence in the Scotty"s Castle Historic District. The work consists of pre-casting concrete fence posts matching the historic shape and color of the existing posts. Installing and resetting concrete posts and installing and repairing fencing based on the historic alignment and elevations.


Option Z Scotty"s Castle Bridge Scour Repair - Repair the foundation of the bridge at Scotty"s Castle and install articulated concrete blocks.


SIGNIFICANT QUANTITIES (Schedule A):
• 20420-0000, EMBANKEMENT CONSTRUCTION: 39120 CUYD
• 25210-0000, ROCKERY: 21400 SQFT
• 25305-1000, REVET MATTRESS, GALVANIZED OR ALUMINIZED COATED: 25500 SQYD
• 30101-0000 AGGREGATE BASE: 13100 TONS
• 30301-1000 DITCH RECONDITIONING: 5.400 MILES
• 30302-2000 SHOULDER RECONDITIONING: 2100 LNFT
• 40101-5600, ASHPALT CONCRETE PAVEMENT, GYRATORY MIX, ½-INCH OR ¾-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL: 10370 TON
• 60901-1100 CURB, CONCRETE, 13-INCH: 6600 LNFT
• 61801-0000 CONCRETE BARRIER: 33000 LNFT


ADDITIONAL INFORMATION FOR NOTICE


The successful contractor must provide an archeological monitor meeting the requirements of the Secretary of Interior Qualification Standards and a certified tribal monitor during soil-disturbing activities along Bonnie Clare Road. Bonnie Clare Road is a culturally sensitive area with confined construction limits.


No construction activity is permitted within the station ranges listed of wetland and non-wetland riparian habitats from April 10 to August 16 to avoid potential habitat and noise impacts to breeding bird species, including the federally endangered least Bell"s vireo and southwestern willow flycatcher.


All construction materials and equipment used on the project will only be allowed access from US 95 and Scotty"s Junction on highway 267 from the Nevada side. The existing roadway is severely damaged and closed to traffic. There is an existing one-way four-wheel drive route. Contractor will need to clear and rough grade roadway for construction access.


The successful contractor must coordinate construction operations with other contractors: Coordinate with NPS contractors and allow access for work in the Scotty"s Castle area on Bonnie Clare Road. Coordinate staging areas in the Scotty"s Castle parking area. The following projects may be concurrent with this project:
(1) Restoration of Scotty"s Castle and Buildings.
(2) Waterline Relocation and Water Storage Facilities.
(3) AT&T telephone line relocation to overhead SCE poles, from Ubehebe intersection to Scotty"s Castle.
(4) NPS maintenance operations.


The estimated price range is between $10 and $14 million, dependent upon the Option(s) awarded.


This will be solicited on a full and open basis.

Added: Jul 17, 2018 10:21 am &nbsp; &nbsp;

Please consult the list of

document viewers if you cannot open a file. Solicitation 1 Type: Solicitation

Posted Date: July 17, 2018



6982AF18B000021.pdf (9008.76 Kb) Description: Solicitation

CA_ERFO_DEVA_11(1)_PLANS_Final_20180522.pdf (201.69 Kb) Description: Plans

CA_ERFO_DEVA_11(1)_XS_Final_20180522.pdf (862.36 Kb) Description: X-Sections

Hydraulics_Report.pdf (7515.40 Kb) Description: Hydraulics Report

Geotech_Report.pdf (6023.76 Kb) Description: Geotech Report

Pavement_Report.pdf (8685.75 Kb) Description: Pavements Report

Amendment 1 Type: Mod/Amendment

Posted Date: August 6, 2018



A001.pdf (2183.11 Kb) Description: Amendment A001

Amendment 2 Type: Mod/Amendment

Posted Date: August 13, 2018



A002.pdf (2381.35 Kb) Description: Amendment A002

Site Visit Sign-in Type: Other (Draft RFPs/RFIs, Responses to Questions, etc..)

Label: Site Visit Sign-in

Posted Date: August 13, 2018



Roster.pdf (514.44 Kb) Description: Site Visit Sign-in

Q&A 8/14/2018 Type: Other (Draft RFPs/RFIs, Responses to Questions, etc..)

Label: Q&A 8/14/2018

Posted Date: August 14, 2018



QnA_8.14.2018.pdf (130.54 Kb) Description: Q&A 8/14/2018

Amendment 3 Type: Mod/Amendment

Posted Date: August 16, 2018



A003.pdf (3492.57 Kb) Description: Amendment A003

Bonnie Clare Rd 2012 As-Builts Type: Other (Draft RFPs/RFIs, Responses to Questions, etc..)

Label: Bonnie Clare Rd 2012 As-Builts

Posted Date: August 16, 2018



DEVA11(1)_Bonnie_Clare_Rd_2012_AS-Builts.pdf (5974.30 Kb) Description: Bonnie Clare Rd 2012 As-Builts

Q&A 8/16/2018 Type: Other (Draft RFPs/RFIs, Responses to Questions, etc..)

Label: Q&A 8/16/2018

Posted Date: August 16, 2018



QnA_8.16.2018.pdf (139.23 Kb) Description: Q&A 8/16/2018

Amendment 4 Type: Mod/Amendment

Posted Date: August 20, 2018



A004.pdf (1440.71 Kb) Description: Amendment A004

Q&A 8/20/2018 Type: Other (Draft RFPs/RFIs, Responses to Questions, etc..)

Label: Q&A 8/20/2018

Posted Date: August 20, 2018



QnA_8.20.2018.pdf (142.96 Kb) Description: Q&A 8/20/2018

Bid Opening Summary Type: Other (Draft RFPs/RFIs, Responses to Questions, etc..)

Label: Bid Opening Summary

Posted Date: August 23, 2018



CA_ERFO_DEVA_11(1)_Bid_Opening_Summary_filled.pdf (19.29 Kb) Description: Bid Opening Summary - All Bids subject to verification.

Bid Tabs Type: Other (Draft RFPs/RFIs, Responses to Questions, etc..)

Label: Bid Tabs

Posted Date: September 5, 2018



Bid_Tabs.pdf (602.56 Kb) Description: Bid Tabs



Contracting Office Address: 12300 West Dakota Avenue
Lakewood, Colorado 80228


Place of Performance: Death Valley National Park
California
United States


Primary Point of Contact.: Ryan Phillips

[email protected]

Secondary Point of Contact: Sheri Muehl

[email protected]